The Pennsylvania Department of Transportation has upped its estimate of the cost to repair damage caused by a May 9 tanker truck fire in Susquehanna Twp.
But, not by much.
District 8 spokesman Greg Penny said the original estimate was $10 million.
That has been increased to $12 million-$13 million. The original estimate did not include reconstruction costs because it was not known at the time.
G.A. & F.C. Wagman Inc., of York was the low bidder for the reconstruction at $3.3 million.