King Of Prussia Rail: Where Will It Go?

As SEPTA moves further down the line in planning a rail extension to King of Prussia, there are a few things we know – and many more that we don’t.

Among the decisions so far: It will be a spur off the Norristown High-Speed Rail Line. The entire five-mile route will be on an elevated concrete track. It will stop at the King of Prussia Mall, end at the Valley Forge Casino and Convention Center, and include two to four stops along the way.

But transit planners, township officials, and business groups are still studying some of the most crucial details, including which of five proposed routes would get the most ridership, how much each route would cost, and how each would affect noise, traffic, and other environmental conditions.

With planning well underway and strong potential for federal funding, SEPTA says the line could be running by 2023.

Read more at http://www.philly.com/philly/news/local/20150322_King_of_Prussia_rail__Where_will_it_go_.html#ADk7y2t3i7i1u2V0.99

Public Meetings Set To Air SEPTA Rail Extension Of Norristown High-Speed Line To Upper Merion

Location of Upper Merion Township in Montgomer...

Location of Upper Merion Township in Montgomery County (Photo credit: Wikipedia)

UPPER MERION TOWNSHIP, PA – Residents in both Upper Merion and Norristown will be presented this week with four alternative routes to extend the Norristown high-speed rail line into Upper Merion in a proposed, $500 million, SEPTA rail project.

Both meetings will run from 4 p.m. to 8 p.m. on Monday and Wednesday. The Upper Merion meeting on Monday will be held at the Radisson Hotel at Valley Forge, 1160 First Ave. and the Norristown meeting on Wednesday will be held at Norristown municipal hall, 235 E. Airy St.

Byron Comati, director of strategic planning and analysis for SEPTA, will present the four alternative routes winnowed down from 16 route variations. He will be joined by project manager and engineer Elizabeth Smith, an AECOM consulting engineer and Burt Cossaboon, a vice president of McCormick Taylor.

Read more:  http://www.timesherald.com/general-news/20141114/public-meetings-set-to-air-septa-rail-extension-of-norristown-high-speed-line-to-upper-merion

SEPTA Regional Rail Strike Begins; Corbett To Seek Federal Help

SEPTA logo with text

SEPTA logo with text (Photo credit: Wikipedia)

SEPTA railroad engineers and electrical workers went on strike early Saturday, halting commuter rail service in the Philadelphia region, after last-ditch efforts by federal mediators failed to break an impasse in the long-running labor dispute.

The strike shut down 13 Regional Rail lines that provide 60,000 passengers with 126,000 rides on a typical weekday. That promised to snarl already clogged highways with additional cars and to hamper commuters and their employers throughout the region.

Service on SEPTA’s buses, subways, trolleys and the Norristown High-Speed Line – which carry about 85 percent of SEPTA’s riders – were not affected.

Gov. Corbett was prepared to ask President Obama to quickly appoint a presidential emergency board to mediate the rail labor dispute. Under federal railroad law, the creation of such a board would compel the workers to return to the job for 240 days.

Read more at http://www.philly.com/philly/business/transportation/20140614_Last-ditch_talks_pending_as_Regional_Rail_strike_looms.html#v26c8poq4F1xhoJB.99

King Of Prussia Rail Project Public Meeting / Open House – January 30th!

SEPTA logo

SEPTA logo (Photo credit: Wikipedia)

SEPTA has scheduled a Public Meeting/Open House for the King of Prussia Rail Project. The King of Prussia Rail Project will evaluate various alternative alignments to make the connection to the NHSL and destinations in King of Prussia.

Date: Thursday, January 30, 2014
Time: 4 p.m. to 8 p.m. (Open House) | 5 p.m. and 7 p.m. (Presentations)
Location: Radisson Hotel at Valley Forge – South Ballroom 1160 First Avenue, King of Prussia, PA 19406

Meeting attendees should use the hotel entrance to reach the South Ballroom.

The Southeastern Pennsylvania Transportation Authority (SEPTA) welcomes your interest and participation in the King of Prussia Rail Project. Early in fall 2012, SEPTA initiated this study to evaluate an extension of the Norristown High Speed Line (NHSL) to the King of Prussia area. The NHSL currently provides service between the 69th Street Transportation Center and Norristown Transportation Center, serving the Main Line area in Delaware and Montgomery Counties, and connecting to Center City Philadelphia. While the transit system is expansive, a rail connection to the King of Prussia area is missing.

The project will evaluate various alignments to provide increased transit service to the King of Prussia area. The project need stems from deficiencies in area transit services that result in long travel times, delays due to roadway congestion, and transfers between services. In addition, there are many destinations in the King of Prussia/Valley Forge area that are underserved or currently not served by public transit.

SEPTA invites you to participate in the project development process and provide input.

Website: http://www.kingofprussiarail.com/

Enhanced by Zemanta

SEPTA Mulls Rail Service To King Of Prussia, Valley Forge

SEPTA logo with text

SEPTA logo with text (Photo credit: Wikipedia)

Editor’s note:  This only makes sense. There are a tremendous number of jobs in King of Prussia/Valley Forge.  Rail service would encourage people to use mass transit who otherwise drive and don’t currently view the Norristown R6 or the High Speed Line as an option.  It could also be a precursor to extending service further west toward Pottstown.

WILL THOUSANDS OF workers finally be able to ride high-speed rail to King of Prussia and Valley Forge instead of a bus that relies on the Jekyll/Hyde, highway to heaven/hell, Russian-roulette insanity of I-76 traffic?

SEPTA will reveal plans for long-awaited rail service to King of Prussia Mall and Valley Forge at a four-hour public meeting tomorrow.

Several alternative extensions of the Norristown High Speed Line to King of Prussia and Valley Forge will be presented.  Public comment is invited.

This “scoping meeting” at the Radisson Hotel Valley Forge – open house at 4 p.m.; presentation at 6 p.m. – is an early stage of the federal process for new-start rail service.

Read more at http://www.philly.com/philly/business/transportation/20130715_SEPTA_mulls_rail_service_to_King_of_Prussia__Valley_Forge.html#ZJcEo1i9KeQpPV41.99

Changing Skyline: Money For Costly Roadwork Would Be Better Spent On Transit

English: A shot from the Pyramid Club of the B...

English: A shot from the Pyramid Club of the Benjamin Franklin Bridge at night. First posted at: Brozzetti Gallery (Photo credit: Wikipedia)

Back in 2010, Gov. Christie shocked transportation experts when he canceled construction of a new rail tunnel to Manhattan, one of the nation’s busiest routes.  The project would have doubled capacity, relieving the terrible rush-hour delays that force NJ Transit and Amtrak trains to queue up to snake through two century-old, single-track tunnels.  But Christie argued that the state couldn’t afford its part of the tab, $3 billion to $5 billion, for relieving the rail congestion.

Price wasn’t an issue earlier this month when South Jersey officials boisterously celebrated the start of another project aimed at reducing congestion.  This one will reconstruct the chaotic Camden County interchange where Interstates 295 and 76 converge with Route 42.  Fixing this one trouble spot – or, rather, making it more tolerable – will cost U.S. taxpayers just shy of $1 billion.

The different responses to these projects speak volumes about how our policymakers think about congestion. Highway traffic jams are still considered unacceptable.  But rail commuters routinely make do with antiquated systems that cause regular delays and breakdowns, like the one that left PATCO riders stranded on the Ben Franklin Bridge for 90 minutes during St. Patrick’s Day weekend.

What makes the I-295 project stand out is its staggering price tag.  Officials say it will take at least $900 million to untangle the South Jersey interchange – a sum equal to 75 percent of SEPTA’s entire annual operating budget.  Yet it doesn’t appear that New Jersey or federal officials ever stopped to ask, “Is this problem just too expensive to fix?”

Read more:  http://www.philly.com/philly/home/20130329_Changing_Skyline__Money_for_costly_roadwork_would_be_better_spent_on_transit.html