Innovative Columbia Borough Digester Plan Gets $1.7M In State Funding

Columbia Borough’s plan to develop what’s believed to be the first biogas production site of its kind in Pennsylvania has gotten crucial state support.

The Commonwealth Financing Authority last week approved a $1.7 million funding package for the venture, which could cost up to $3.5 million.

The state package consists of a $1,449,952 loan and a $300,000 grant from the authority’s Alternative and Clean Energy program.

Columbia Borough intends to build an anaerobic digester at its wastewater treatment plant that would use food waste, delivered by truck from area food-processing plants and other sources.

Read more:

http://lancasteronline.com/business/local_business/innovative-columbia-borough-digester-plan-gets-m-in-state-funding/article_c2be3eb2-fe26-11e4-a8aa-77ab18e7e403.html

South Side Site Becoming Pittsburgh’s Second Compressed Natural Gas Station

English: Symbol used for vehicles powered by c...

English: Symbol used for vehicles powered by compressed natural gas. (Photo credit: Wikipedia)

A former Exxon station in Station Square is becoming the city’s second compressed natural gas station with the help of state funding announced this week.

The station, located near the T station at the edge of the Smithfield Street Bridge, is currently under construction.  It will be owned by Desdemona Holdings LP and operate under the American Natural Retail brand.

Desdemona Holdings received a $372,300 grant and $248,200 loan to help complete the project.  Desdemona is a wholly owned subsidiary of Cleopatra Resources LLC, a New York-based energy company with local offices near Homestead.

A timetable for completion was not given.

Read more: http://www.post-gazette.com/stories/business/news/south-side-site-becoming-citys-second-cng-station-687147/#ixzz2T04Iwgfq