$300M Being Pumped Into I-81Between Wilkes-Barre And Scranton

Locator map of the Scranton-Wilkes-Barre Metro...

Locator map of the Scranton-Wilkes-Barre Metropolitan Statistical Area in the northeastern part of the of . (Photo credit: Wikipedia)

Christopher Santizo faces a challenge every time he drives to class at Luzerne County Community College in Nanticoke.

The 29-year-old graphic design and advertising student who commutes from Duryea, said construction on Interstate 81 routinely has made it difficult to get to class on time.

“I’ve been everywhere from stopped to 45 miles per hour,” he said.

He is among an estimated 70,000 drivers who traverse a half-dozen Pennsylvania Department of Transportation construction projects totaling more than $100 million between Wilkes-Barre and Scranton. Upon completion of those projects, PennDOT will begin widening the highway near Scranton to the tune of $174 million — ensuring years of additional construction zones.

Read more: http://timesleader.com/news/local-news-news/1333853/Endless-I-81-construction-tests-drivers-patience

Enhanced by Zemanta

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s